Changing Landscape

GH2.jpg

The specialist landscape company, Shoreline, have been progressing quickly with the essential maintenance work along the southern bank of the Wom. The green arrow points to the location of the Cotswold stone boulders, which have been positioned in such a way as to create an interlocked ‘keyed in’ screen of resistant material on the stream embankment, designed to withstand the onslaught of increased stream flows during times of heavy rainfall. A spokesman from the company added that gradual landscaping would be enacted soon to complete the work.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.